BENEFITS/CHALLENGES
Unique Challenges
The challenges of this project were to identify the cause of the settlement of the interior grade slab and the perimeter foundation of the building without performing any demolition of the structure, interior floor slabs or the interior and exterior finishes.
Our Value Add
Raymond was able to identify several potential issues that may be causing the settlement. Our team coordinated with a geotechnical consultant to perform soil testing adjacent to the building in the settlement areas and prepared a report identifying remediation efforts needed to stabilize the structure. Utilizing our recommendations, Clemson University can address the settlement and prevent further deterioration of the facilities.