BENEFITS/CHALLENGES
Unique Challenges
Coordination of the construction schedule with facility operations and academic calendar requirements proved to be a challenge. Our team diligently worked to meet construction goals while respecting the school’s academic schedule.
Our team had to provide additional scaffolding and protective barriers at entrances and building elements in order to provide protections during demolition.
Our Value Add
Raymond provided a new external gutter system which replicates the historic “ogee” profile of the original built-in gutter system while eliminating the possibility of internal leaking.
Our team incorporated fiber cement materials to eliminate susceptibility to rot at the eaves, while referencing historic dimensions and trim profiles.
We provided a new fall protection system for both low-slope and high-slope roof conditions as well as a new roofing system for both low-slope and high-slope conditions with 20-year warranties.